Updating the still-to-do LIST:
Master Bedroom:-build out wall around hydro wires-hang closet doors-paint ceiling-hang curtains
Bedroom 2:-install armoire-hang curtains
Bedroom 3: -paint ceiling-hang door-hang curtains
Bathroom-paint walls and ceiling-install light fixture
Kitchen:-paint walls-install cabinet hardware-get rid of that blue gunk in the cabinets (install shelf paper I think)-move blinds from bedroom to kitchen window-install light fixture
Living Room:-wash blinds (blech)
Hmmm...I think that's all. I have until Saturday. Should accomplish it. I hope.
I think that's al